Installation; Set Up And Operation - SHOWTEC quadro flower v2 User Manual

Table of Contents

Advertisement

Installation

Remove all packing materials from the Quadro Flower. Check that all foam and plastic padding is
removed. Connect all cables.
Always disconnect from electric mains power supply before cleaning or servicing.
Damages caused by non-observance are not subject to warranty.

Set Up and Operation

Before plugging the unit in, always make sure that the power supply matches the product specification
voltage. Do not attempt to operate a 120V specification product on 230V power, or vice versa.
When the mounting bracket (1) isn't fitted, you will first have to fit the mounting bracket in order to hang
it from a ceiling. You can also place this device on the floor.
Connect the device to the main power supply. The device is music-controlled by its built-in microphone.
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the quadro flower v2 and is the answer not in the manual?

Questions and answers

Table of Contents