Body Solid GLGS100 Owner's Manual page 18

Table of Contents

Advertisement

S T E P
4
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware first in this step. Wrench tighten ALL hardware at the end of
STEP 4E. Some components may be pre-assembled. Nylon lock nuts will not fully screw
onto bolts, they must be wrench tighten to fully go on.
4A. Route Cable (44) and install one ø90mm Pulleys (21) on Weight
Rotating Tube (J) per Step 4 Drawing using:
1 - (#7) M10x50mm Hex Head Bolt
1 - (#13) M10 Nylon Lock Nut
2 - (#15) M10 Flat Washer
2 - (#18) Pulley Spacer ø15xø11x5mm
4B. Attach Press Arms (G & H) and Logo Plate (S) together using:
2 - (#5) M10x75mm Carriage Bolt
2 - (#15) M10 Flat Washer
2 - (#13) M10 Nylon Lock Nut
4C. Attach Press Arms (G & H) to Upper Upright (K) using:
1 - (#42) Shaft
2 - (#14) M12 Flat Washer
2 - (#12) M12 Nylon Lock Nut
4D. Insert Adjustment Bar (T) into one of the adjustment holes of Upper
Upright (K) to support Press Arms (G & H).
4E. Attach two Chrome Weight Horns (R) to Press Arms (G & H) using:
2 - (#8) M10x20mm Button Head Cap Screw
2 - (#16) M10 Lock Washer
2 - (#17) M10 Large O.D. Flat Washer
4F. Insert two Round End Caps (32) onto two Chrome Weight Horns (R).
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents