Body Solid GLGS100 Owner's Manual page 16

Table of Contents

Advertisement

S T E P
3
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware first in this step. Wrench tighten ALL hardware at the end of
STEP 3F. Some components may be pre-assembled. Nylon lock nuts will not fully screw
onto bolts, they must be wrench tighten to fully go on.
3A. Attach Weight Rotating Tube (J) to Upper Upright (K) using:
1 - (#4) M10x80mm Hex Head Bolt
2 - (#15) M10 Flat Washer
2 - (#26) Bushing
1 - (#13) M10 Nylon Lock Nut
3B. Attach two Chrome Weight Horns (R) to Weight Rotating Tube (J) using:
2 - (#8) M10x20mm Button Head Cap Screw
2 - (#16) M10 Lock Washer
2 - (#17) M10 Large O.D. Flat Washer
3C. Insert two Round End Caps (32) to two Chrome Weight Horns (R).
3D. Attach two Chrome Weight Horns (Q) to Left & Right Support Frames
(F & E) using:
4 - (#6) M10x70mm Hex Head Bolt
8 - (#15) M10 Flat Washer
4 - (#13) M10 Nylon Lock Nut
3E. Insert Round End Caps (32) & Rubber Donuts (31) onto Chrome Weight
Horns (Q)
3F. Attach Knee Lock Tube (V) to Lower Upright (A) using:
1 - (#6) M10x70mm Hex Head Bolt
2 - (#15) M10 Flat Washer
1 - (#13) M10 Nylon Lock Nut
3G. Insert Round Tube (W) onto Knee Lock Tube (V)
3H. Insert two Knee Lock Foam Rollers (28) and two Round End Caps (29)
onto Round Tube (W).
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents