Intel 12300; Chassis Replacement; E.2 Intel 12300 - Intel True Scale Fabric Switches 12200 Installation Manual

True scale fabric switches 12000 series
Hide thumbs Also See for True Scale Fabric Switches 12200:
Table of Contents

Advertisement

12000 Series Switches
Figure 69.
12200 Management Card Insertion (3)
4. Rack mount the switch in the existing rails on the rack.
5. Connect Ethernet and Serial cables.
6. Connect AC power.
7. If applicable, upgrade the switch firmware, and change the switch, gateway and
subnet mask addresses to a new network address.
8. Cable all applicable IB ports.
E.2

Intel 12300

E.2.1

Chassis Replacement

FRU part numbers:
• Standard 36-port chassis: 12300BS01
• 12300 18-port chassis: 12300BS18
E.2.1.1
Removal Procedures
1. Power down the switch by unplugging AC power.
2. Remove all applicable IB, Ethernet and serial cables. Set these aside for reinstalling
the replacement switch.
3. Remove the switch from the rack. Keep all rail hardware installed in the rack.
4. Remove the hat rails from the switch. Set these aside for reinstalling the
replacement switch.
July 2015
Order Number: G91928004US
True Scale Fabric Switches 12000 Series Hardware
Installation Guide
95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents