Start-Up Procedures - Intel True Scale Fabric Switches 12200 Installation Manual

True scale fabric switches 12000 series
Hide thumbs Also See for True Scale Fabric Switches 12200:
Table of Contents

Advertisement

12000 Series Switches
2.9.1.2
User Site Installation
After final installation of a 12800-series switch is completed at the end user site:
1. Disengage the thumb screw and partially rotate the lever as shown in
Figure 48.
MRL Protective Label 5
2. Peel off the protective label. Re-engage the lever and tighten the thumb screw as
shown in
Figure 49.
MRL Protective Label 6
2.9.2

Start-up Procedures

1. Power up the switch.
2. From its flash image on the management module, the switch begins its boot
process.
Note:
If the DB9 port of the SEEB or the RS232 port on the 12200/12300 is connected to a
terminal emulation program, the user will be able to view the switch boot process. Be
certain to use a null-modem/crossover serial cable for the console port. For users
assembling their own cable, refer to Appendix C for serial port pinout information. The
settings for the terminal emulation device should be:
• 8 data bits
• no parity bits
• 1 stop bit
• 57.6K baud
• Use VT100 emulation.
July 2015
Order Number: G91928004US
Figure
49.
True Scale Fabric Switches 12000 Series Hardware
Figure
48.
Installation Guide
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents