Loading From The Pallet - Intel True Scale Fabric Switches 12200 Installation Manual

True scale fabric switches 12000 series
Hide thumbs Also See for True Scale Fabric Switches 12200:
Table of Contents

Advertisement

Figure 35.

Loading from the Pallet

7. Position the chassis on front on the rack. Use pallet jack to move the chassis.
Orient the chassis on a pallet in front of the rack as shown. Chassis rear should be
facing front of the rack. For installations in racks arranged in rows, distance
between adjacent rows of racks (width on a cold isle) should be greater than 36" to
be able to move the chassis on a pallet through a cold isle.
True Scale Fabric Switches 12000 Series Hardware
Installation Guide
42
12000 Series Switches
July 2015
Order Number: G91928004US

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents