Installation Tasks; Locating Mounting Posts - Intel True Scale Fabric Switches 12200 Installation Manual

True scale fabric switches 12000 series
Hide thumbs Also See for True Scale Fabric Switches 12200:
Table of Contents

Advertisement

recirculation control panels should be installed in a rack to minimize airflow
recirculation between the hot and cold isles. Recirculation control panels for wide racks
and installation instructions are available from rack suppliers.
Figure 30.

Locating Mounting Posts

2.7.3

Installation Tasks

Note:
It is recommended that 12800-360 is installed into the rack at 5U or 6U location. This
will locate the chassis approximately 12" from the floor and will allow the chassis to be
moved onto the support rails by sliding off the pallet.
1. Install clip nuts: If applicable, remove the doors of the rack. Install M6 clip nuts in
the following locations on EIA rails for U5 installation. For U6 installation, increment
clip nut locations by one U (1.75").
True Scale Fabric Switches 12000 Series Hardware
Installation Guide
38
12000 Series Switches
July 2015
Order Number: G91928004US

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents