11
SERVICE WORK ON THE CHASSIS
11.13
Greasing the steering head bearing
11.14
Removing the start number plate
Main work
–
Loosen screws
–
Loosen and retighten screw
Guideline
Screw, top steering head
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
Guideline
M01141-10
Screw, top triple clamp
–
Locate and tighten screw
Guideline
Screw, top steering stem
(All SX models)
Screw, top steering stem
(All XC models)
Finishing work
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
–
Mount the handlebar cushion.
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
800010-10
(All 125/150 models)
–
Remove screw
–
Disconnect the brake line at the start number plate. Take off the start number
plate.
M01142-10
(All 250/300 models)
–
Remove screw
–
Remove screw
M01190-10
. Remove screw
.
.
.
.
M8
M8
(
p. 47)
(
p. 48)
.
and take off the clamp.
. Take off the start number plate.
M20x1.5
12 Nm (8.9 lbf ft)
M8
17 Nm
(12.5 lbf ft)
20 Nm
Loctite
(14.8 lbf ft)
17 Nm
Loctite
(12.5 lbf ft)
p. 50)
p. 44)
51
®
243™
®
243™