11
SERVICE WORK ON THE CHASSIS
11.12
Adjusting the steering head bearing play
11.13
Greasing the steering head bearing
Main work
–
Move the handlebar to the straight-ahead position. Move the fork legs to and fro in
the direction of travel.
No play should be noticeable in the steering head bearing.
»
If there is noticeable play present:
–
Adjust the steering head bearing play.
–
Move the handlebar to and fro over the entire steering range.
The handlebar must be able to move easily over the entire steering range. No
H01167-01
resting locations should be noticeable.
»
If click positions are noticeable:
–
Adjust the steering head bearing play.
–
Check the steering head bearing and change if necessary.
Finishing work
–
Remove the motorcycle from the lift stand. (
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the handlebar cushion.
Main work
–
Loosen screws
–
Remove screw
–
Loosen and retighten screw
Guideline
Screw, top steering head
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid stresses.
–
Mount and tighten screw
S01217-10
Guideline
Screw, top steering stem
–
Tighten screws
Guideline
Screw, top triple clamp
–
Check the steering head bearing play. (
Finishing work
–
Mount the handlebar cushion.
–
Remove the motorcycle from the lift stand. (
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
800010-10
1
.
2
.
3
.
2
.
M8
1
.
(
p. 42)
(
p. 43)
(
p. 45)
(
p. 45)
p. 39)
p. 39)
M20x1.5
12 Nm (8.9 lbf ft)
20 Nm
Loctite
(14.8 lbf ft)
M8
17 Nm
(12.5 lbf ft)
p. 44)
p. 39)
45
®
243™