Kipor SINEMASTER IG1000 Operation Manual page 19

Hide thumbs Also See for SINEMASTER IG1000:
Table of Contents

Advertisement

AC application
1. Start the engine and make sure only the output indicator light (green) comes on.
2. Confirm that the appliance to be used is switched off, and plug in the appliance.
■ Substantial overloading that continuously lights the overload indicator light (red) may damage
the generator. Marginal overloading that temporarily lights the overload indicator light (red)
may shorten the service life of the generator.
■ Be sure that all appliances are in good working order before connecting them to the generator.
If an appliance begins to operate abnormally, becomes sluggish, or stops suddenly, turn off
the generator engine switch immediately. Disconnect the appliance and examine it for signs
of malfunction.
3. In order to insure the optimum output and the maximum service life of the generator, the
generator should run at a 50% load for the first 20 hours.
output indicator
light
overload indicator
light
18
插头
plug

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents