Heta SCAN-LINE 40 Operating Instructions Manual page 28

Table of Contents

Advertisement

Continue with the back stone and
then another side stone. Place brack-
ets and pins. See fig. 8
28
Place the last row of soapstone. Start
with the front stone, then side stone,
then back stone and side stone again.
Place brackes (no pins are required).
See fig. 9.
Fig. 8
Fig. 9
Scan-Line 50

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scan-line 50

Table of Contents