Further details regarding the individual steps
Rated heating output
Nozzle gap "a" (see page 36)
Commissioning, inspection, maintenance
2. Insert a new LE nozzle F (counter-
holding the oil preheater).
Select the nozzle in accordance with
the details on page 31.
!
Please note
Only use nozzles marked
"V" (on the hexagon, see
illustration).
3. Insert rifling facility E as far as it will
go. Align ignition electrodes C to the
cable entries according to the holes
drilled. Install the oil burner nozzle
centrally into the restrictor.
4. Secure Allen screw D of the rifling
facility. Check nozzle gap "a".
!
Please note
An incorrectly adjusted nozzle
gap "a" can result in irregular
operation of the burner and
even a fault shutdown.
kW
12.9/19.3
mm
+0.2/-0.3
3.0
5. Refit mixing valve B. Tighten
screws A with a torque of ≥ 5 Nm/
≤ 8 Nm (see page 35).
(cont.)
16.1/23.5
+0.2/-0.3
1.5
37