NCR Columbus 800 User Manual page 26

Table of Contents

Advertisement

NCR Orderman Columbus800
9. Open the CableLock™ Cover (Thumbscrew).
Fig. 18: Open CableLock
10. Secure the excess power cables with a cable tie and route the cables behind the CableLock
Cover.
Fig. 19: Route Cables
11. Close the CableLock™ Cover and secure it with the Thumbscrew.
12. Reinstall the Base Cover.
Orderman GmbH (Part of NCR Corporation)
User Guide V01.00
TM
TM
CableLock
Cover
Thumbscrew
TM
CableLock
Cover
26
Hardware Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents