Engine Mount Installation; Installing The Stopper Assembly - Seagull Models YAK 55 Assembly Manual

Table of Contents

Advertisement

YAK 55.
Rudder control horn.

ENGINE MOUNT INSTALLATION.

1) Locate the items necessary to install the
engine mount included with your model. .
4x30mm.
2) Use four 4x30mm head bolts and four 4mm
washers to attach the engine mount rails to
the firewall. Tighten the screws . Make sure to
use threadlock on the screws to help prevent
them from vibrating loose.
6
Instruction Manual
Thread locker glue.

INSTALLING THE STOPPER ASSEMBLY.

1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon tubes
leaving 1/2" protruding from the rear of the
stopper. This will be the fuel pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other end
to the nylon pick up tube.(The silicon tube is
not included).
3) Carefully bend the second nylon tube
up at a 45º angle. This tube is the vent tube.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents