Seagull Models YAK 55 Assembly Manual page 17

Table of Contents

Advertisement

4) Allow the glue to fully cure for at least 6
hours.
5) When fully cured, move each control
surface throughout is travel range serveral
times to break away any epoxy in the hinge.
Be sure to deflect the surface fully.
ELEVATOR - RUDDER CONTROL HORN
INSTALLATION.
1) Install the elevator control horn using
the same method as with the aileron control
horns.
2) Position the elevator control horn on
the both side of elevator.
Elevator control horn.
Rudder control horn.
www.seagullmodels.com
four ball link as same as picture shown below.
Rudder control horn.
Elevator control horn.
RUDDER PULL PULL CABLE
INSTALLATION.
See pictures below:
1) Prepair the rudder servo arm by attach
M3 lock nut.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents