Osburn Stratford CFOB04006 Operating & Installation Instructions Manual page 2

Zero clearance wood inbuilt
Table of Contents

Advertisement

THANK YOU FOR CHOOSING THIS WOOD INBUILT
We want to congratulate you on your purchase and wish to help you get maximum satisfaction from your
wood inbuilt. In the pages that follow, we will give you advice on wood heating and controlled combustion
as well as technical specifications regarding installation, operation and maintenance of the model you have
chosen.
The
instructions
AS/NZS 4012/4013 and AS/NZS 2918 standards.
Please read this entire manual before you install and use your new wood inbuilt. Failure to follow
instructions may result in property damage, bodily injury, or even death. It is important that you follow
the installations guidelines exactly.
Consult your local city, borough or shire council about restrictions and installations requirements in your
area and the need to obtain a permit.
This heating unit is designed to serve as a supplementary heat source. We recommend that a primary
heat source also be available in the home. The manufacturer cannot be responsible for costs associated
with the use of another heating system.
KEEP THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE.
PLEASE NOTE THAT THE PICTURES SHOWN IN THIS MANUAL ARE GENERIC
AND MAY NOT MATCH EXACTLY THE LOOK OF YOUR ZERO CLEARANCE WOOD
2
pertaining
to
the
OPERATING & INSTALLATION INSTRUCTIONS FOR STRATFORD CF ZERO CLEARANCE WOOD HEATER
installation
of
your
INBUILT.
wood
inbuilt
comply
with

Advertisement

Table of Contents
loading

Table of Contents