Tail Installation - Hangar 9 toledo special 40 Assembly Manual

Table of Contents

Advertisement

Tail Installation

Required Parts
Fuselage assembly
Horizontal fin assembly
Vertical fin assembly
#4 fender washer (2)
4-40 lock nut (2)
Tools and Adhesives
Nut driver or box wrench: 1/4-inch
Step 1
Open the bag marked elevator. Set aside the clevis, clevis
retainer and pushrod keeper for installation in the next
section of the manual.
Step 2
Locate the vertical and horizontal stabilizers. Slide the
threaded rods from the vertical stabilizer through the holes
in the horizontal stabilizer. Make sure the blue trim on the
horizontal stabilizer faces up toward the vertical stabilizer as
shown in the photo below.
Hangar 9 Toledo Special Assembly Manual
Step 3
Slide the horizontal and vertical stabilizers tightly together
as shown. You will need to deflect the rudder to allow the
rudder control horn to pass by the elevator.
Step 4
Slide the threaded rods into the holes in the aft end of the
fuselage as shown.
Step 5
Slide the tail assembly tightly against the fuselage. Make
sure to guide the portion of the vertical stabilizer with the tail
wheel carefully into the slot at the rear of the fuselage so the
fuselage is not damaged by side loads.
Step 6
Secure the tail assembly to the fuselage using two #4 fender
washers and two 4-40 lock nuts. Use a 1/4-inch nut driver
or box wrench to tighten the nuts. Make sure not to over-
tighten the nuts and accidentally damage the sub-fin or
fuselage.
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents