Replacing Load Cells - Sartorius MW1P Service Manual

Midrics series
Table of Contents

Advertisement

AUT23999a.JPG / 6740-81a.jpg
30

Replacing Load Cells

If an off-center load error is detected (platforms with one load cell), or if the
output signal from the load cell is too high or too low (InF 02 is displayed during
span adjustment), replace the load cell.
Because the mechanical construction of the platforms is basically uncomplicated,
no detailed description of the disassembly procedure is included here.
Important:
AUT23998JPG
To replace a load cell in a platform with four load cells, use two eye bolts
(6740-81) in two corners and then lift the weighing platform. Remove
the plastic caps from the bore holes before inserting the eye bolts.
The eye bolts can be ordered under spare part number 6740-81.
– When reassembling the weighing platform, make sure to replace any plates that
were under the platform frame.
lastz_1.jpg
Repairing the Weighing Platforms

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mw2sMw1sMis1Mis2Mw2pMapp1 ... Show all

Table of Contents