See Figure 3-1 before installing the UPS cabinet. The UPS cabinet base is equipped with
forklift slots to accommodate lifting and moving the equipment. The forklift slots are
located on all four sides of the cabinet base to meet individual needs. The wireway section
on the right side of the UPS cabinet (as seen from the front) must be removed to gain
access to the right side fork lift slots (see Figure 3-1).
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
1. Move the UPS to the final installed location using forklift jacks between the foam
2. Remove hardware labeled 1" and 2" in Figure 3-2, then remove the sheet metal
3. Loosen, but do not remove the hardware holding the foam cushions to the other
Lift only at forklift openings or cabinet damage may occur.
4. Insert the forklift jacks in the forklift slots and raise the UPS cabinet until the foam
3−2
EATON Powerware
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Ó Ó Ó
Removable
I/O Section
Behind Door

Figure 3-1. Removable I/O Section

cushions on the bottom of the unit.
support on the desired face of the unit base to expose the forklift slots.
sheet metal supports (labeled 1" in Figure 3-2).
cushions clear the floor by approximately 3 mm (1/8").
9315 UPS (200–300 kVA) Installation Manual S 164201037 Rev G www.powerware.com
®
Do Not Lift
C A U T I O N
Hidden
Forklift
Slots

Advertisement

Table of Contents
loading

Table of Contents