Figure 10-2. Terminal Block Bracket; Figure 10-3. Wiring An Rim To The Ups - Eaton powerwave 9315 Installation Manual

200–300 kva
Table of Contents

Advertisement

Installing a Relay Interface Module
Connect to
Port 1 (DB−9) on
Communication Panel
10−2
EATON Powerware

Figure 10-2. Terminal Block Bracket

DB−9 Connector
(on UPS Communication Panel)
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
TB2
TB1

Figure 10-3. Wiring an RIM to the UPS

9315 UPS (200–300 kVA) Installation Manual S 164201037 Rev G www.powerware.com
®
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó
Fuse
Terminal
Block
(TB3)

Advertisement

Table of Contents
loading

Table of Contents