Pitney Bowes DM100i Quick Install Manual page 9

Hide thumbs Also See for DM100i:
Table of Contents

Advertisement

Step 17 Congratulations!
Your Mailing System is Ready to Use
• Select OK.
To customize your meter settings and learn all about using your
system, see the Operator Guide on the enclosed CD, or refer to
the Quick Reference Guide.
Install Optional Moistener
The handy moistener allows you to moisten, seal, and apply postage to
your envelopes all in one smooth step. Position the moistener on the left
side of the deck as shown. Hold down the blue release lever and slide
moistener from left to right, with the lip of the moistener above the deck.
14
Moistener
Release
Lever
Install Moistener (continued)
Deck
Lip
Position Stacker
The stacker provides a convenient location to store your processed
mail, tape sheets, and guides. Position the stacker next to the
system as shown. Just slide it into place. It does not connect
mechanically to the system.
Solution
Level
Fill the moistener reservoir with
Pitney Bowes E-Z Seal sealing
solution. You may fill it later if
you don't plan on moistening and
sealing envelopes right now.
Stacker
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dm200l

Table of Contents