4 - UNPACKING

PREPARATION AND UNPACKING
The Compact Slim 15 boiler is delivered complete with all its electrical, mechanical and hydraulic components and having been tested in
the factory:
Remove the cardboard, supports and polystyrene that secure the boiler to the pallet. At this point, open the two side panels and remove
the two brackets holding the boiler. To remove the brackets, undo the two "t" screws between the bracket and the pallet and the two "u"
screws between the bracket and the boiler (fig.1).
Install the boiler in the area set aside for it, making sure it conforms to the requirements. The boiler body or unit must always be kept
in a vertical position when moved, and only ever moved using suitable lifting trolleys. Pay particular attention to the door and its glass,
protecting them from mechanical knocks that would compromise their integrity.
The product must always be moved with care. If possible, unwrap the boiler near the chosen place of installation. The packaging materials
are neither toxic nor harmful, and therefore no particular disposal measures are required.
The product, as indicated in figure 1 consists of a single packaged unit.
After removing all the packaging, check that the boiler is complete and not damaged. If in doubt, contact the retailer.
The following documents are provided in the package:
Plant booklet
Instruction booklet
Annex G - Technical test report for thermal plant of less than 35 kW.