4-UNPACKING

PREPARATION AND UNPACKING
The Compact Easy Clean boiler is delivered complete with all its electrical, mechanical and hydraulic components (excluding the circulator
kit and thermostatic valve-OPTIONAL) and having been tested in the factory:
Box 1 contains the structure of the boiler, while box 2, on top of the packaging, contains the trolley (to make it easier to move and remove
ash) and the compressor, required to turn on the turbulators.
Remove the cardboard (fig.1), remove the brackets that secure the boiler to the pallet (see fig.2). There are two fixing brackets, one at the
front and one at the back (fig.2).
FIGURE 1 - PACKAGING
22
2
1
1
2
FIGURE 2 - REMOVING THE PACKAGE
BRACKETS