4-Unpacking - RED COMPACT 45 Installation Manual

Pellet boiler
Table of Contents

Advertisement

4-UNPACKING

PREPARATION AND UNPACKING
The Compact 45 boiler is delivered complete with all its electrical, mechanical and hydraulic components (excluding the circulator kit and
thermostatic valve-OPTIONAL) and factory tested:
Remove the cardboard (fig.1), remove the brackets that secure the boiler to the pallet. There are two fixing brackets, one at the front and
one at the back (fig.2).
FIGURE 1 - PACKAGING
To remove the brackets:
open the boiler door
remove the three screws "u"
remove the three screws "t"
remove the two brackets "S"
Install the boiler in the area set aside for it, making sure it conforms to the requirements. The boiler body or unit must always be kept
in a vertical position when moved, and only ever moved using suitable lifting trolleys. Pay particular attention to the door and its glass,
protecting them from mechanical knocks that would compromise their integrity.
22
u
t
S
FIGURE 2 - REMOVING THE PACKAGE BRACKETS
S

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents