Unpacking - RED COMPACT 14 Installation Manual

Pellet boiler
Table of Contents

Advertisement

4 - UNPACKING

PREPARATION AND UNPACKING
The Compact 14 boiler is delivered complete with all its electrical, mechanical and hydraulic components (excluding the pump kit-
OPTIONAL) and having been tested in the factory:
Remove the cardboard, remove the brackets that secure the boiler to the pallet as well as the polystyrene. To remove the rear bracket
(fig.2) one must remove the three screws "x" that secure it to the pallet and the three screws "y" that secure it to the boiler.
Figure 1 - Packaging
20
y
Figure 2 - Rear bracket
removal
x

Advertisement

Table of Contents
loading

Table of Contents