Through A Factory Built Chimney - Drolet Eco-65 DP00060 Installation And Operation Manual

Hide thumbs Also See for Eco-65 DP00060:
Table of Contents

Advertisement

Eco-65 Installation and Operation Manual

4.5.4 Through a Factory Built Chimney

To make an installation through a factory
built chimney, run a 4" stainless steel liner
inside the factory built chimney.
1. Position
stove
given
in
Section
Clearances
to
following
vent
instructions.
2. Install a cleanout tee to the stove
exhaust. If necessary, use a horizontal
additional length between the exhaust
and the tee. If you wish to center the
vertical part of the vent with the stove, a
45° elbow and a tee can be used to
route the pipe from the exhaust towards
the back center of the stove.
3. Connect the pellet vent to the stainless
steel
liner
according
manufacturer's instructions.
4. Seal and install vertical roof vent. If
required, seal and install a storm collar.
WARNING: IN THE U.S., THE USE OF A STAINLESS STEEL LINER IS MANDATORY. IN
CANADA, IT IS NOT MANDATORY BUT IS STRONGLY RECOMMENDED.
NOTE: VENTING DIRECTLY IN AN OVERSIZED CHIMNEY AND OMITTING THE USE OF
A STAINLESS STEEL LINER CAN AFFECT CHIMNEY DRAFT AND DECREASE STOVE
PERFORMANCES.
20
following
clearances
3.2:
Minimum
Combustibles
and
manufacturer's
to
the
vent

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco-65

Table of Contents