US Water Systems Greenwave Plus 385-GWP-1000-UV Owner's Manual page 27

Table of Contents

Advertisement

27
Step 15: Carefully insert the UV lamp into the reactor sliding it inside the quartz sleeve located in-
side the reactor (do not drop the lamp into the reactor). Affix the lamp connector into the gland nut by in-
serting the connector into the nut and turning the connector approximately ¼ turn to lock the connector to
the gland nut.
Step 16: Af f i x t h e c ap t i v e g ro u n d s c rew t o t h e g ro u n d l u g o n t h e UV r eac t o r t o en s u r e p ro p er
grounding continuity.
Visit us online at www.USWaterSystems.com
US Water UV Light Installation
Figure 7. UV Lamp Connection
Figure 8. Quick Disconnect Connector
US Water GreenWave Plus Salt-Free Water Conditioner | 385-
Give us a call at: 1-800-608-8792

Advertisement

Table of Contents
loading

Table of Contents