Specific Maintenance Work; Replacing The Ionisation/Ignition Electrode - REMEHA Quinta Pro Installation, User And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro:
Table of Contents

Advertisement

10 Maintenance

10.4 Specific maintenance work

Fig.62
Replacing the ionisation/ignition elec­
trode
3
2
1
64
Perform the specific maintenance work if this proves to be necessary fol­
lowing the standard inspection and maintenance work. To conduct the
specific maintenance work:

10.4.1 Replacing the ionisation/ignition electrode

The ionisation/ignition electrode must be replaced if:
4
AD-0000088-01
The ionisation current is < 4 µA.
The electrode is damaged or worn.
The electrode is included in the service kit.
1. Remove the plug of the electrode from the ignition transformer.
Note
The ignition cable is fixed to the electrode and therefore may not
be removed.
2. Remove the two screws.
3. Remove the entire component.
4. Fit the new ionisation/ignition electrode.
5. Reassemble the unit in the reverse order.
123157 - v.07 - 10082015