Pcbs - REMEHA Quinta Pro Installation, User And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro:
Table of Contents

Advertisement

6 Installation
Fig.27
Blocking input
On/off
OT
BL
RL
Tout Tdhw
Fig.28
Release input
On/off
OT
BL
RL
Tout Tdhw
Fig.29
Open housing for PCBs
2
36
The boiler has a blocking input. This input relates to the BL terminals of
the connector.
The parameter
AD-0000052-01
The boiler has a release input. This input relates to the RL terminals of the
connector.
The parameter
The parameter
AD-0000053-01

6.6.5 PCBs

The PCBs are positioned in the PCB housing.
The following PCBs are already installed in the PCB housing:
1
x3
AD-3000341-01
Blocking input
Warning
Only suitable for potential-free contacts.
Note
First remove the bridge if this input is used.
can be used to change the function of the input.
For more information, see
Changing the parameters, page 50
Release input
Warning
Only suitable for potential-free contacts.
can be used to change the function of the input.
can be used to change the wait time of the input.
For more information, see
Changing the parameters, page 50
IF-01
SCU-S02
SCU-X01
123157 - v.07 - 10082015

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents