REMEHA Quinta Pro Installation, User And Service Manual page 41

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro:
Table of Contents

Advertisement

123157 - v.07 - 10082015
Note
After switching on the power and if there is adequate water pres­
sure, the boiler always runs through an automatic venting program
lasting approximately 3 minutes (air may escape via the automatic
air vent during filling). If the water pressure is lower than 0.8 bar,
the symbol
will appear. If the water pressure is too low, top
up the CH installation.
Caution
Carry out the filling within 30 minutes to avoid the venting pro­
gram starting up. That would indeed be undesirable if the boiler
is not filled. Switch the boiler off if the CH installation is not be­
ing topped up immediately.
When venting, prevent water from getting into the boiler casing
and electrical parts of the boiler.
6 Installation
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents