BodyCraft 302 Instruction Manual page 10

M press strength training system
Table of Contents

Advertisement

STEP 5
ball with hook end
Route the AB Cable (29) through the lower slot, over the pulley in the Front Upright (2) as
shown in A6, down to the pulley mounted on the Base Frame (1) as shown in A5, then up and
over the lower pulley on Adj. Pulley Block (19) as shown in A4, down to the furthest back pulley
on the Base Frame (1), then forward to the Leg Extension Arm (7) as shown in A3. Make sure
the AB Cable (29) runs under both pulleys on the Base Frame (1) and under the pulley on the
Leg Extension Arm (7).
T8
A4
A6
A3
AB Cable Assembly
AB CABLE (29)
2
A5
1
A5
52
83
1
A6
59
80
68
A2
9
ball with hook end
A1
70
52
59
80
83
A2
2
83
80
59
83
52
A3
52
1
70
A4
7
19
83
52
A1
7
68
80
59
70
52
1
83
T8
70

Advertisement

Table of Contents
loading

Table of Contents