Seagull Models Shoestring SEA143 Assembly Manual page 21

Table of Contents

Advertisement

ELEVATOR PUSHROD HORN
INSTALLATION.
1) Install the elevator control horn using
the same method as with the aileron control
horns.
2) Position the elevator control horn on
the both side of elevator.
Elevator control horn.
Elevator control horn.
Rudder control horn.
3) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the horns
on until they are flush with the ends of the con-
trol rods.
4) Elevator and rudder pushrods assembly
as pictures below.
www.seagullmodels.com
652mm.
Cut.
Elevator pushrod.
Control horn.
M2 lock nut.
Metal clevis.
8mm.
8mm.
21

Advertisement

Table of Contents
loading

Table of Contents