ECOSOL INTERFACE BOARD
Regulates the power from the solar panel(s)
Monitors battery charge
Charges batteries
Manages power. Shuts down all components not needed
when system is not in use
Processes starting commands. Powers up the system and
relays signals once system is operational
Receives radio commands. Has a built-in low power
consumption radio receiver with a 64 transmitters capacity,
eliminating the need for external receivers
THREADED HOLES
For the installation of (2)
Diablo Controls DSP-6LP
or DSP-7LP

THE SYSTEM

(2) 12V, 9 Ah batteries
30% more capacity than standard 7 Ah batteries
www.BFTGateOpeners.com | (800) 878-7829
LIBRA UL-R CONTROLLER
Controls (2) Phobos BT or Igea BT operators.
Self learning torque settings.
Adjustable independent gate leaf delay
TEST BUTTON
Triggers the START
input for the
installer's and
service technician's
convenience.
TERMINAL BLOCKS
Clearly labeled, easy
access terminal block
connections