Mounting and commissioning the machine
After unpacking the machine, check it for any transport damage. In case of damage, inform
the shipping company and the responsible PFAFF dealer.
8
Mounting
.01
At the machine's location, there must be a stable and horizontal surface as well as suitable
electricity and compressed air supplies (see chapter 3 Specifi cations).
Fig. 8 - 01
● Lift the machine with a forklift from the shipping pallet.
● Level the machine just above the ground, and adjust the feet accordingly.
● The table height can be adjusted at crank 1 after loosening screws 2.
Mounting and commissioning the machine
The machine must only be mounted and commissioned by qualifi ed personnel!
All relevant safety regulations are to be observed!
2
1
2