Installing Ffp Assembly On Cylinder - TOHATSU TLDI 40 Service Manual

Table of Contents

Advertisement

Assemble the following components.
w Cable terminal upper grommet
r Seal ring (O-ring)
w and r
Grease to apply:
Genuine engine oil
!0 Upper case
!8 Bolt: type H518 at 4 locations
Torque: 2.6 to 3.5 N-m: 0.27 to 0.36 kg-m:2.0 to 2.6 Ib-ft

Installing FFP Assembly on Cylinder

Install the following components.
q FFP assembly
w Bolt: type H630 at 2 locations
Washer
Rubber mounts
Collars
Torque: 4.6 to 6.3 N-m: 0.47 to 0.64 kg-m: 3.4 to 4.6 Ib-ft
e Fuel hose
r Fuel return hose
t Vapor return hose
Install hose and apply clip.
y High-pressure fuel hose
Torque: 14 to 16 N-m: 1.4 to 1.6 kg-m: 10 to 12 Ib-ft
u FFP cable connector (cable assembly)
Secure the FFP cable connector to the cylinder
using the clamp.
y
r
u
4-28
q
t
w
e

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tldi 50

Table of Contents