Turbotemp Wiring Diagram; Connection Diagram - Waterco Turbotemp 200HD Installation And Operation Manual

240 vac natural gas/lp gas
Table of Contents

Advertisement

TURBOTEMP WIRING DIAGRAM

(3-WIRE SYSTEM)
Inlet Temperature Control Switch
and AGS Switch
Stack Flue Sensor
Gas Valve
BL
BL
W
W
Y/W
R
Y
R
External Control Interface Circuit Disabled,
Heater Membrane Pad Enabled
JMP
1
JMP
1
External Control Interface Circuit
Enabled, "Pool On" and "Spa On"
Keys Disabled. "OFF" Key on
Membrane Pad Remains Functional.
Plug –12 pin
240V – Red
1
12 Position
Receptacle
JUNCTION BOX
Line 1
BR
BL
Line 2
Ground
G/Y
GND

CONNECTION DIAGRAM

Air Flow Switch
Extra Switch 1
Hi-Limit Switch
Pressure Switch
O
O
O
O
PR
PR
PS
HLS
ES1
OPERATING CONTROL
AFS
AGS
SFS
JMP3
GAS
1
Spa Line
External Control Interface
W
BK
F1
DIAGNOSTIC INDICATOR
120 VAC
IGNITER
BK
O
GY
GY
R
GY
W
BK
Y
BL
NOTICE: Touching any 24VAC wire, including
the Fireman's Switch wire, to the 240V
terminal while the heater is connected to line
power will immediately destroy the control
board and void the warranty.
Y/R
Y/BL
Y/O
Y/W
Y
Y
Y
Y
Y
BR
BR
NA/LP
Models Only
J6
MEMBRANE PAD
CONNECTION
Common Line
Pool Line
Y
24
F2
VAC
IGNITION CONTROL
MODULE
S1
S1/
TH IND VAL GND
120 L1
L2
S2
240
Y/W
GY
GY
BK
GY
Y/O
Y/BL
Y/R
Y/W
GND
BK
BK
BK
W
R
W
BK
Y
BL
G
GND
Section 3. Installation
Y/W
Y/BL
Y
Y/O
Y/R
Y
Y
24 VAC
SEC
W
BK
F
TRAN S
S
I
R
W
I
E
M
T
L2
L1
FL
C
A
N
H
S
BM
F1
Y
R
BLOWER
I pg 34
Y
Y
Y
Y
O
W
R
R
W

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Turbotemp 400hdTurbotemp 300hd

Table of Contents