Preparation; Unpacking The Product; Checking The Contents - Omron S8BA-24D24D120LF User Manual

Hide thumbs Also See for S8BA-24D24D120LF:
Table of Contents

Advertisement

2 Preparation

2 Preparation
2-1

Unpacking the product

Open the package box and take out the UPS and accessories.
Caution for installation and connection
Carry the unit considering its weight and balance, and place it on a
stable and robust base.
▪ If you drop the unit, the battery or the battery protection mechanism may be broken,
and it may result eventually in a fluid leak, abnormal heating, smoke, rupture or fire.
▪ If you drop the unit, stop using it and have it inspected and repaired. For repair,
contact our sales personnel.
2-2

Checking the contents

Check whether all the package contents are included and there is no damage found on
their appearance. If you should notice defects or anything wrong, contact our sales
personnel.
■ Accessories related to the main unit
Description
Instruction manual
USB cable
22
Instruction manual
2-1 Unpacking the product
Quantity
1
1
USB cable
S8BA-24D24D□□□LF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8ba-24d24d240lfS8ba-24d24d360lfS8ba-24d24d480lf

Table of Contents