Installation Location; Assembly - AEG protect d. 1000 Operating Instructions Manual

Table of Contents

Advertisement

The original carton provides effective protection against damage
and should be kept in case the device has to be transported
again at a later date.
Always keep plastic bags away from babies and children to
prevent suffocation.
Handle the components with care. Think of their weight and have
a second person to assist with lifting.
4.2

Installation location

The PROTECT D is designed to be installed in a protected
environment. When choosing that location, make sure that there
is adequate ventilation and other appropriate environmental
conditions.
Install the devices in a room that is dry, relatively dust-free and
free of chemical vapors.
Make sure that no magnetic storage media are stored and / or
operated in the vicinity of the PROTECT D.
4.3

Assembly

For the rack installation of the UPS system and its external
battery units (special accessory), please note the following:
 To prevent vibration and jarring, the installation location has
to have adequate stability.
 Make sure the rack is able to support the installation,
particularly when external battery units (special accessory)
are used.
 Install the units so that there is adequate air circulation.
Make sure there is at least 100 mm of free space behind the
The PROTECT D is air-cooled. Do not block the
vents!
The UPS and its battery modules in particular
should preferably be operated at room temperature
(between 15°C and 25°C).
Check the type plate to make sure that the voltage
and frequency specifications match those of your
load segments.
23
EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents