Connecting the load segments

Before you connect the load segments to the UPS, please make
sure that the actual power output on the type plate is larger than
or equal to the sum of the load power consumption.
Connect the desired load segments to the output jacks of your
UPS. Use the load segment connection cords that come with the
device. Pay attention to the division of the output plugs (also see
Chapter 5.2 on pg. 29). Connect critical load segments that
require a constant power supply preferably to the output jacks with
a permanent power supply. The manageable output power circuits
divide the load segments. To remove the load segment power
cords, press the red button below the corresponding output outlet.
Leave your load segments switched off for the time being. If
further load segment connections are required, please contact
your retail dealer.
Removal by pushing
the red push button
Fig. 18
Load segment power circuit
:
i
The segment load on the UPS should never exceed the specified
nominal load of the device. If the device is overloaded for any
reason, the red LED will light up to indicate the problem and a
warning sound will be heard. The load segments connected will
continue to be supplied with power, depending on how much of an
overload there is, for a certain time, but the load must be reduced
accordingly as soon as possible.
If you ignore the "device overload" warning, this can result in a
complete loss of the UPS functions!
Also try to avoid short-term device overloads, which can occur,
for example, if you connect a laser printer or a laser fax machine.
In the case of a common service cabinet (electric
circuits as well as power supply and UPS voltage),
mark each circuit with the corresponding supply
(mains power line or UPS).