Specifications; Unpacking The Stove - Jøtul GF 200 DV IPI Installation And Operation Instructions Manual

Gf 200 dv ipi lillehammer direct vent gas stove
Table of Contents

Advertisement

139587_05 GF 200 DV IPI October 2015
GF 200 DV IPI

Specifications

Input Rates
Natural Gas
20,000 BTU/hr. maximum input
11,000 BTU/hr. minimum input
Propane
18,000 BTU/hr. maximum input
9,000 BTU/hr. minimum input
Inlet Pressure:
MIN
Natural Gas:
5.0 WC (1.25 kPa)
Propane:
12.0 WC (3.0 kPa) 14.0 WC (3.48 kPa)
Manifold Pressure:
MIN
Natural Gas:
1.1 WC (.27 kPa)
Propane:
2.9 WC (.72 kPa)
• SIT Prof lame 1 Intermitent Pilot Ignition - 120V / 60 Hz
• Steady State Efficiency: 72.92% NG / 73.09% LP
• AFUE Efficiency:
• CSA P4. 1-02 Fireplace Efficiency:
NG - 69.11%
LP - 68.97%
• Factory Air Shutter Settings: NG - 1/16" LP - 1/8"
• Continuous Pilot Ignition Mode (CPI) is available
• Power Requirement: 120 VAC
AC/DC Power Adaptor, High Temperature / 7V
Back-up Battery Pack: 4, AA - 1.5V
• Ambient Temperature Range: 32 -122°F (0 - 50°C)
15 1/16”
383 mm
18”
457 mm
9 5/16”
237 mm
5/8 Venting off Rear
4
MAX
7.0 WC (1.74 kPa)
MAX
3.80 WC (.95 kPa)
11.0 WC (2.74 kPa)
68.6% NG / 68.2 % LP
17 3/16”
437 mm
22 3/4”
578 mm
Height Dimensions with Optional Long Legs:
13 5/8”
- add 2 1/4 in. (57 mm)
321 mm
25”
635 mm
4 3/16”
106 mm
Unpacking your stove
CAUTION: Enamelled parts may be damaged if handled
without care. Use assistants to position the stove.
Place removed parts on a towel or other protective
material.
1. FAMILIARIZE YOURSELF WITH THE VENTING, CLEARANCE
AND OTHER INSTALLATION REQUIREMENTS IN THIS
MANUAL BEFORE BEGINNING THE INSTALLATION.
2. SAFETY BARRIER SCREEN: This appliance is equipped
with a Certified Barrier Screen that must be installed
before operating the unit. It is secured to the shipping
pallet. Remove two screws and break the attachment
bracket off of the frame at the perforation. The barrier
assembly attaches to the stove front by engaging its
brackets over the stove door hinge bosses. The barrier
may be installed with the stove doors either open or
closed.
3. Remove the Top Plate of the stove by simply lifting it
straight off of the stove body.
4. To open the firebox, disengage the two Glass Frame
Latches located on top of the firebox. Pull each handle
forward to clear the latch from the notch in the frame
and lift the frame straight up out of the stove.
5. Connect the battery box wire leads to the black and
red DFC harness connectors under the back of the
stove. Tuck the connected wire harness up into the
slot on the DFC bracket as shown in Fig 47, page 24.
Install the backup batteries into the battery box and
attach the box to the hook and loop tape on the
bottom of the gas valve. See fig. 48a on page 25.
6. Connect the AC/DC Power Adaptor to the terminal on
the left of the DFC module mounting bracket as shown
in Fig. 48a. Connect the power adaptor to 110 VAC
house current.
7. INSTALL ACCESSORIES BEFORE LOCATING THE STOVE
IN ITS FINAL POSITION. Follow the instructions in this
manual or those included with the accessory items.
Safety Screen
Barrier
6”
152 mm
22”
559 mm
21 7/16”
544 mm
18”
457 mm
26 13/16”
681 mm
4/6 Venting to Vertical

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents