Haier HDBL655AFS Installation Instructions Manual page 20

24" built-in dishwasher
Hide thumbs Also See for HDBL655AFS:
Table of Contents

Advertisement

INSTALL THE WATERLINE
NOTE: Routing the water line through the left side of cabinet opening will make
water connection easier.
1. Drill a 1/2" (1.3 cm) hole in the cabinet side, rear or floor. Preferred and optional
locations are shown in the following graphic.
2. Measure to determine the overall length of copper tubing required for the water
line.
3. Attach copper tubing to the manual shutoff valve.
a
4. Slowly feed copper tubing through hole in cabinet. Copper tubing will bend and
kink easily, so be gentle. The copper tubing should be far enough into the cabinet
opening to connect it to the dishwasher inlet on the front left of the dishwasher.
5. Slowly turn water shutoff valve to "ON" position. Flush water into a shallow pan
to get rid of particles that may clog the inlet valve.
6. Turn shutoff valve to "OFF" position.
INSTALL THE DRAIN HOSE
IMPORTANT: Always use a new drain hose.
1. Drill a 11/2" (3.8 cm) hole in cabinet wall or floor on the side of the opening closest
to the sink.
18
b
a
a
Preferred Locations
b
Optional Locations
a
Copper Tubing

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hdbl655afwHdbl655afb

Table of Contents