Installing The Mezzanine Board - QUANTA Rackgo X Series F03A Technical Manual

Superior serviceability 4 x compute node 2u server
Table of Contents

Advertisement

I
H
NSTALLING
ARDWARE
9. Place the mezzanine board in an anti- static bag.

Installing the Mezzanine Board

1. The mezzanine board requires the attachment of a mezzanine sponge (with mylar).
Align the sponge to the mezzanine board along the marked area.
2. Connect the USB cable to the mezzanine card connector.
3. Align the holes located at one end of the mezzanine card with the guide posts on
the securing clips.
4. Lower the mezzanine board and gently press down to secure with the clips.
5. Align the bracket with the I/O ports on the mezzanine board.
Figure 2-44. Removing the Mezzanine Board
Figure 2-45. Installing the Mezzzanine Board
I
M
NSTALLING THE
EZZANINE
B
OARD
2-32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents