Figure 13-7 Cables and screws of the operation panel
3.
Pull the operation panel forward to remove it.
Note - Place the removed operation panel on a grounded antistatic ESD mat.
13.5
Installing the PSU Backplane
Unit/Operation Panel
13.5.1
Installing the operation panel
1.
Set the BB-ID of the operation panel to the value prior to the start of
maintenance.
2.
Insert the operation panel at the installation location, and connect one cable
to the operation panel.
Fujitsu M10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual ・ November 2014
274
A