Suzuki DF 25 Service Manual page 69

Four stroke
Hide thumbs Also See for DF 25:
Table of Contents

Advertisement

3-18 ENGINE CONTROL
6. Remove three bolts 7, battery charge and power source
coils 8, then disconnect coil lead wire connectors.
INSTALLATION
Installation is reverse order of removal with special attention to
the following steps.
Battery charge & power source coil
• Apply Thread Lock 1342 to the coil securing screws.
99000-32050 : Thread Lock 1342
CKP sensors
Apply Thread Lock 1342 to the sensor mounting screws.
99000-32050 : Thread Lock 1342
Flywheel
• Clean flywheel and crankshaft mating surfaces with cleaning
solvent.
• Apply engine oil lightly to flywheel bolt before installing.
• Tighten flywheel bolt to specified torque.
09930-48720 : Flywheel holder
Flywheel bolt : 190 N . m (19.0 kg-m, 137.5 lb- ft)
Wire routing
Check wire routing. (See page. 11-2 to 11-12)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df 30

Table of Contents