MID UNIT 8-21
Remove circlip B and push out tilt cylinder upper rod C.
Remove nut 1 from clamp bracket shaft.
Remove tilt cylinder lower shaft bolts 2.
Slide STBD clamp bracket 3 off clamp bracket shaft.
Remove the PTT unit assembly. (T model)
Remove the gas assisted tilt cylinder. (Q model)
Remove bonding wire 5 from PORT clamp bracket.
Pull PORT clamp bracket 6 outward to remove clamp bracket
and bracket shaft 7 from swivel bracket 8.
Remove bushings from each side of swivel bracket.