Reassembly - Suzuki DF 25 Service Manual

Four stroke
Hide thumbs Also See for DF 25:
Table of Contents

Advertisement

REASSEMBLY

Reassembly is reverse of removal with special attention to fol-
lowing steps.
• Ensure that the drive joint 1 is aligned and firmly inserted
into the gear pump assembly.
• Fit O-ring 2 to PTT motor.
• Check the level of PTT fluid contained in the pump & reser-
voir. If level is low, add recommended PTT fluid until level with
mating surface of PTT motor.
• Ensure that the faces of the PTT motor and reservoir are free
of dirt or debris.
When attaching the PTT motor to the pump & reservoir, en-
sure that the tip of armature shaft fits firmly into the drive
joint.
• Install seal and reservoir, then tighten the two (2) screws to
specified torque.
Reservoir screw : 4.5 N . m (0.45 kg-m, 3.3 lb.-ft.)
• Pour recommended PTT fluid into reservoir until specified
level.
• Carry out the air bleeding.
For air bleeding, see page 9-3.
POWER TRIM AND TILT
9-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df 30

Table of Contents