Suzuki DF 25 Service Manual page 280

Four stroke
Hide thumbs Also See for DF 25:
Table of Contents

Advertisement

12-12
DF25/30 "K3" (2003) MODEL
PTT MOTOR (Applicable model)
Brush length
Commutator outside
diameter
PEAK VOLTAGE
Requirements for peak voltage measurement
• Remove all spark plugs to eliminate the variables at cranking speed.
• Crank with recoil starter or starter motor.
• Use a STEVENS peak voltage tester, Model CD-77.
Testing sequence
No.1
1
CDI output
No.2
No.3
2
Power source coil output
No.1
CKP sensor
3
output
No.2
Battery
Manual start
4
charge
Electric start
coil output
STD
mm (in)
Limit
mm (in)
mm (in)
STD
Limit
mm (in)
Tester probe connection
+ (Red)
– (Black)
Orange
Blue
Black
Light green
Brown
Green
White
Red
Black
Red/White
White/Black
Yellow
Red
9.8 (0.39)
4.8 (0.19)
19.5 (0.77)
18.5 (0.73)
Peak voltage
Tester range
POS 500
64V or over
POS 500
21V or over
SEN 50
3V or over
4V or over
POS 50
8V or over
Remarks
With ignition coil
connected.
With CDI unit
disconnected.
With rectifier
disconnected.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df 30

Table of Contents