Installation - Suzuki DF 25 Service Manual

Four stroke
Hide thumbs Also See for DF 25:
Table of Contents

Advertisement

INSTALLATION

Installation is reverse order of removal with special attention to
following steps.
10
1. Release lever
2. Lower coller (STBD)
3. Lower coller (PORT)
4. Gas cylinder
5. Tilt cylinder lower shaft
6. Tilt cylinder upper shaft
7. Upper bush
8. Lower bush
9. Bolt
10. Bolt
11. Nut
12. Snap ring
Release lever
Install release lever 1, bolt 2 and lock nut 3 as shown in
figure.
Tighten lever bolt 2 and lock nut 3 securely.
9
12
7
11
1
2
5
4
6
7
12
8
3
10
MID UNIT 8-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df 30

Table of Contents