Reassembly - Suzuki DF 25 Service Manual

Four stroke
Hide thumbs Also See for DF 25:
Table of Contents

Advertisement

6-6 RECOIL STARTER

REASSEMBLY

System construction
Reassembly is the reverse order of disassembly with special
attention to the following reassembling steps.
99000-25160 : Suzuki Water Resistant Grease
99000-32050 : Thread Lock 1342
• Install the reel stopper C, reel stopper spring B and then
NSI cable 0.
1 Reel
2 Bolt
3 Friction plate
4 Friction spring
5 E-ring
6 Ratchet (Pawl)
7 Ratchet guide
8 Return spring
9 Recoil spring
0 NSI cable
A Recoil case
B Spring
C Reel stopper
D Rope
E Grip
F Bolt
G Bolt

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df 30

Table of Contents