Installing The Piston And Cylinder - Orion AGB-21G Service Manual

Table of Contents

Advertisement

CYLINDER AND PISTON
Piston-pin-to-piston clearance =
Piston pin bore size b –
Piston pin outside diameter a
Piston-pin-to-piston clearance
0.002

INSTALLING THE PISTON AND CYLINDER

1. Install:
top ring 1
2nd ring 2
upper oil ring rail
oil ring expander
lower oil ring rail 5
NOTE:
Be sure to install the piston rings so that the
manufacturer's marks or numbers face up.
2. Install:
piston 1
piston pin 2
piston pin clip 3
NOTE:
Apply engine oil onto the poston pin.
Make sure that the mark "IN" on the piston
points towards the intake side of the cylinder.
Before installing the piston pin clip, cover the
crankcase opening with a clean rag to prevent
the clip from falling into the crankcase.
3. Install:
gasket 1
New
dowel pins 2
4. Lubricate:
piston
piston rings
cylinder
(with the recommended lubricant)
Recommended lubricant
Engine oil
4 - 30
0.019 mm
3
4
New

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents